Skip to main content
iForce Graphics — Cache Valley & Salt Lake County vehicle wraps, signs & print
Toyota — Logan, UT

Toyota Tacoma Wraps

The Toyota Tacoma is one of the most-wrapped trucks in the Cache Valley. Matte Military Green and Satin Black are the runaway favorites for the Cache Valley overland crowd.

Color Change
$3,800 – $5,200
Install Time
5–7 business days
Category
truck

The Toyota Tacoma is one of the most-wrapped trucks in the Cache Valley. Matte Military Green and Satin Black are the runaway favorites for the Cache Valley overland crowd.

Wrapping a Tacoma: the practical case

Trucks get wrapped for two different reasons, and the Tacoma sees both. Personal trucks come in for color changes and accent work — Matte Military Green and Satin Black lead the requests. Work trucks come in for branding, where a truck that spends its day on job sites and highways is the cheapest billboard a contractor can run. Either way, the large flat panels wrap efficiently, which is why trucks sit at the friendlier end of wrap pricing per square foot.

Built for how Utah trucks are used

A wrap on a working truck needs to survive gravel roads, canyon winters, road salt, and high-altitude UV. That's a film-selection problem: we spec premium cast vinyl with a 7-year manufacturer warranty and add paint protection film on rocker panels and leading edges where chip damage concentrates. Edges are tucked behind removed trim rather than trimmed on the paint, because an exposed edge on a truck that works outdoors is where lifting starts.

Cost and time

Full wraps on the Tacoma typically run $3,800 – $5,200 with premium film, about 5–7 days in the studio. Commercial graphics — partial wraps, cut vinyl, fleet branding — are quoted by coverage and design scope, and fleet multiples bring the per-truck number down.

Most Popular Tacoma Finishes

  • Matte Military Green
  • Satin Black
  • Matte Charcoal
  • Color-Shift Earth
FAQ

Tacoma — Common Questions

Quote your Toyota Tacoma today.

24-hour quote turnaround. Logan-based install team. Most projects start within two weeks.